Tuesday, October 28, 2008

Foundation rubble work completed


Foundation rubble work in dry pack is completed except for the forced filling of quarry dust into rubble work which could not be done due to non availability of Electric motor and water.A few loads of rubble,One load of river sand half completed workers shed are remaining at site

a house is taken on rent nearby for staying of workers and that is now being left locked paying rent due to stoppage of work

.Picture shows Foundation rubble work

Tuesday, October 21, 2008

Rubble work for foundation


After earth work excavation,rubble work for foundation is in progress using special Paalikkallu obtained from Ezhattumukham.Picture shows work in progress

Saturday, October 11, 2008

Set out


Set out for the house being constructed started at 10.45 A.M on 11,October,2008 and completed by 12.45 P.M

We have started set out using the original lines made for stone laying by keeping the stone laid in the South West corner of the building

As 2.53 meters is left in the rear side originally while laying the stone,one wall will come very close to well therby necessiating removal of well before completion of the foundation work.
One more small tree has to be removed and Electrical switch board has to be shifted to rear compound wall side for earth work excavation work

Picture shows commencement of set out work

Wednesday, October 8, 2008

Set out for Construction




Set out for construction will be done on 11,October,2008 and earth work excavation for foundation will start immediately afterwards.Picture shows paady being harvested at Kuttanad on our way to Thiruvalla with machines